A stretch of county road pavement in North Dakota that Infrasense scanned using GPR.

4000+ Miles of County Roads Project in North Dakota

Infrasense worked with the Upper Great Plains Transportation Institute and Dynatest Consulting to complete a NDT subsurface pavement structure investigation as part of a legislature-commissioned study to determine the investment needs for all county and township roads and bridges in North Dakota. The pavement investigation project included GPR pavement thickness and structure data collection and…

CT bridge project gpr survey infrasense

GPR Condition Surveys of Connecticut Highway Bridge Decks

Infrasense performed high speed scanning on major highway bridges throughout Connecticut, including the Arrigoni Bridge in Middletown, the Sisson Avenue interchange on I-84 in West Hartford, and the complex “Waterbury Stacks” on I-84 in Waterbury. Combined, these projects represent over 1-million square feet of bridge deck. Infrasense collected ground penetrating radar (GPR) data on these…

GPR and FWD Survey of Composite Pavement in CT Route 2 in Hartford, Connecticut

In 2015, Infrasense carried out a pavement evaluation program for a ~2.8 mile section of Route 2 in East Hartford, Connecticut using a combination of ground penetrating radar (GPR), falling weight deflectometer (FWD), and selective coring. The objectives of this program were as follows: Confirm limits of full-depth asphalt and the composite sections of pavement…

Condition Evaluation of the Silliman Evans Bridge in Nashville, TN

Infrasense recently completed deterioration mapping for two mainline bridge decks and six adjacent ramp decks, representing over 100,000 square feet. The Silliman Evans Bridges carry Interstate 24 over the Cumberland River, just north of the I-24/I-40 interchange. The deterioration mapping was performed using vehicle-mounted high-speed ground penetrating radar (GPR) to scan each bridge deck without…

Condition Assessment of 181 Bridge Decks in Minnesota’s Metro, Southeast, and Northeast Regions

Infrasense has surveyed 181 decks throughout Minnesota’s Metro district and Districts 1 and 6 using Infrared Thermography (IR) and Ground Penetrating Radar (GPR), accompanied by underside visual inspections. GPR data was carried out at highway speeds with no disruption to traffic, and IR data was collected using a rolling lane closure. All traffic control was…

Multi-Phase Condition Evaluation of a 1.5-Mile Viaduct on I-515 in Las Vegas

The State of Nevada commissioned a deck rehabilitation project of the “Downtown Las Vegas Viaduct”, which spans over 1.5 miles of I-515, beginning just east of the I-15 interchange in Las Vegas, Nevada. In order to facilitate planning and subsequent design efforts, a comprehensive nondestructive evaluation of the deck condition was carried out by Stantec…

GPR Evaluation of 236 Bridge Decks Throughout Montana

Infrasense carried out high-speed GPR condition evaluations on 236 decks throughout the state of Montana. Of the 236 decks surveyed, 165 were selected for a Level 2 analysis, which involved detailed mapping of the concrete deterioration. Additionally, rebar depth contour plots were created which facilitate more accurate deck repair volume calculations. Per the request of…

Utah bridge deck scanning by infrasense

Nondestructive Condition Surveys of 26 Bridge Decks for Utah DOT

Infrasense recently completed bridge deck condition evaluations of 25 bridge decks on or over Interstates 15, 80, and 84 using high-speed ground penetrating radar (GPR), infrared thermography (IR), and high-resolution video (HRV). Of the 25 decks evaluated in this project, 11 were surveyed using GPR, IR, and HRV; the remaining 14 decks were surveyed using…